Back to Photo List
Back to Sketch List
Back to Cross-Section List
Back to Homepage
This multisection building is being strapped to a designated load flatbed
for shipment. This particular building will house chlorination equipment
in one section, and dechlorination equipment in the other. Both sides are
wired with lights and fans. Each side has an external switch for the light
and fan. The chlorination side is equipped with panic hardware (not shown).
The external load center (right wall) distributes power to both sections;
normally our customers want this inside the building, but in either case
we provide our load centers with a NEMA4x enclosure of its own.